I arrived in Pia Manzi few days ago and we have been doing the infrastructure planning for Moringa plantations, Lodge Accomodations, Conservation Camps and electrifying the area with hydropower designs. This post is about the Hydropower project mainly, because I have to upload the pictures before I can add them to Google Earth where we are doing the powering plan. More about everything when I have time! Thank you for showing interest!
Overall Satellite View from the Plan |
![]() |
Draft Stream 1 |
![]() |
Draft Stream 2 |
![]() |
Draft Stream 3 |
![]() |
Draft Stream 4 |
![]() |
Draft Stream 5 |
![]() |
Draft Stream 6 |
![]() | ||
Draft Stream 7
|
![]() |
2nd River Draft Stream |
![]() |
Valley of Pisces |
![]() |
Down Stream Dam Wall (big) |
![]() |
Streamline 1 - Dry Season |
Ei kommentteja:
Lähetä kommentti